“The cost of the project is T1.5 billion. 50 new jobs will be created,” reads the report.
The project implementation period is 2025-2026. At the same time, it is noted that T87 million has been allocated for the development of the tourist zone to connect the power grid to the Black Canyon.
Photo source: picture from an open source