On the oil pipeline Uzen–Zhetybai–Aktau restarted oil pumping

Date: 11:56, 05-06-2019.

Almaty. June 5. KazTAG - The Uzen – Zhetybai – Aktau oil pipeline resumed oil pumping after an accident, informed the press service of KazTransOil JSC.
“On June 2, at 22.14 in the Mangystau region, as a result of depressurization of the technological pipeline passing through the territory of the Zhetybai oil pumping station, oil transportation was stopped through the Uzen – Zhetybai – Aktau trunk pipeline. In the elimination of the consequences of the incident, were involved 12 units of special equipment of the Mangystau oil pipeline control department”, - the message says.
The KazTransOil JSC specified that the pipeline was invalid 26 hours and 58 minutes.

Photo source: picture from the open source

Share the news: