"The situation with the Triumph arch is hard. In the time of construction of underground tunnel part, the construction works were made with poor quality. The annual current repair does not allow correcting the drawbacks. The capital repair will cost over 600 mln tenge," said Nurkenov.
According to Sergey Solodovnikov, Maslikhat deputy, the repair of the tunnel part and some engineering networks need urgent solution.
He reminded the arch was opened in 2011 in honor of the 20th anniversary of independence and represents a symbol of triumph of Kazakhstani people.
Photo source: sputniknews.kz